Case Study

Hydram Engineering
The Client
Hydram Engineering is one of the largest sheet metalwork sub-contractors in the UK. Being an energy intensive manufacturer, they have an overall annual energy spend of over £550k.
Hydram Engineering was founded in 1977 by the late Harry Young with his children John Young, Judith Porter and Gillian Young as the original partners. The name HYDRAM is made up of family names – Harry (HY), his wife Dorothy (D) and the middle names of the three children, John Robert, Judith Anne and Gillian Margaret.
The company is is certified to the ISO 9001 Quality Standard, the ISO 3834-2 Welding Standard, the BS EN 15085-2 CWRVC Welding Standard, the DIN 6701 standard for adhesive bonding in rail industry and the ISO 14001 Environmental Standard.
The Challenge
The client signed a contract to perform a retrospective audit on their energy.
Further Information on this Case Study
Find out how IU Energy solved this client’s energy challenges – access and download the complete case study below: –